Application on fresh concrete:
- After placing the main concrete into the formworks and its sufficient setting such that it is walkable (2-5 hours, depending on ambient conditions), prepare the floor hardener according to the instruction and place it in the formworks with a thickness of 2 cm, then finish the surface.
Application on old concrete
- First, totally indent the concrete’s surface with special tools. Then leave it in contact with water for 24 hours to become completely saturated, and at last, thoroughly clean it with a water jet such that any remaining loose fragments and dirt are removed. Then, depending on the required slope, place formworks and fill them with floor hardener.
Application by spraying on fresh concrete
- Spray the product on fresh concrete immediately after concreting, and before surface finishing, then finish the surface.